Page 12 - John George Blair
P. 12

This, the crews first Main Force operation to the Bourg-Leopold military Barracks in
                                                    th
                                                th
                Belgium on the evening of 11 /12  May 1944. The crews Lancaster ME782 carried
                a full war load of 1 x 4,000 lb high capacity bomb known as a ̔Cookie̕ and 16 x 500 lb
                                               medium capacity bombs.
   7   8   9   10   11   12   13   14   15   16   17