Page 36 - William B. Lake
P. 36

The B&G Target Ranges – Johnstone Lake

         There was a significant number of team members who would travel the 10 km daily to enable the
         functioning of the bombing ranges. One of Bill’s airgraphs indicated that it also took a lot of effort
          to maintain the floating targets (wooden pyramid structures on rafts). The firewater supply to the
                         Mossbank 2B&GS site also was via a pumping station at the Lake,










































                                 Bill with several of his crew at the Bombing Ranges



































                     Bill’s photo of the target areas located in Johnstone Lake & on its shoreline
   31   32   33   34   35   36   37   38   39   40   41