Page 37 - Peter Brown
P. 37

nd
                    Crew bombing picture taken on 22  March 1945 showing the aiming point in
                Hildersheim. The picture was taken at 14-05 and 30 seconds. The Lancaster was on
                    a course of 118 degrees and its bomb load was a normal area bombing load
                 consisting of 1x 4,000 lb high capacity demolition bomb known as a ‘Cookie’ to the
                   crews and 19x 4lb incendiaries canisters. The bombing height was 14,250 feet.
   32   33   34   35   36   37   38   39   40   41   42